An axle weighbridge installed at Smorgan Steel’s Laverton site required the weighbridge pit to be lined with lead to shield the load cells from the electrical interference being generated by a 22 kVA cable buried approximately 1500mm below the axle weighbridge’s foundations.




Latest Weighbridge News




